CEMENT GROUTING SERVICES

Applications

We provide engineering and technical support for cement grouting in rock, soil, and large-scale concrete applications. Portland and microfine cement grouts are used for large-volume structural and heavy-duty grouting applications:

✔ Ground improvement by compaction grouting
✔ Soil grouting for deep excavations
✔ Consolidation grouting of sandy soils beneath building foundations
✔ Curtain grouting of rock fissures and voids in underground tunnels
✔ Soil stabilization projects, such as with sheet piling and excavations in water-bearing soils

Featured Projects

Soil Stabilization for High-rise

Soil Stabilization for High-rise Development Construction

Freezing January temperatures and severe leaks near Lake Ontario created unstable soil conditions that halted work at a Toronto high-rise site. Specialists secured the cracked wall by mounting a metal plate between structural supports and drilling access holes directly through it. The team injected cement grout through the plate to stabilize the surrounding soil, stop the water flow, and allow construction to safely resume..

Cement Grouting to Fill Voids

Cement Grouting to Fill Voids in Tunnel Cross Passage

A public transit agency discovered water infiltrating a subway tunnel due to hidden voids behind a cross-passage wall. Workers drilled investigative holes and installed mechanical valves to pump microfine cement grout directly into the flooded cavities. The injection successfully displaced the water and filled all voids, stopping the leaks so utility crews could safely resume work.

Ventilation Raise Construction

Ventilation Raise Construction in a Gold Mine

An underground gold mine required a new ventilation raise built through fractured, water-bearing rock. Specialists used inflatable packers, specialized pumps, and mixers to pump cement grout into perimeter holes drilled along the raise alignment. By filling open fractures before pilot drilling and reaming, the team successfully sealed the rock to allow safe excavation.

Grout Curtain Wall for a Hydroelectric Dam

Grout Curtain Wall for a Hydroelectric Dam

A new hydroelectric dam construction project in Northern Manitoba was delayed due to water seepage at the spillway cofferdam structure. Our grouting specialists resolve this type of issue on a regular basis by designing and implementing a grout curtain wall. A cement grouting plan was designed and executed by our experienced technicians and within two weeks of grouting, seepage was reduced from 250lt/s to 140lt/s.

Consolidation Grouting in a Tailings Dam

Consolidation Grouting in a Tailings Dam

A large mining company required upgrades to an existing tailings storage facility to comply with current regulatory standards. The general contractor undertaking the required upgrades retained the services of MME Multiurethanes to supply cement grouting equipment and experienced grouting specialists for consolidation grouting of fractured rock beneath the alignment of the new tailings dam. The grout curtain consisted of three rows of holes, drilled to a nominal depth of 10 m. Cement grouting equipment consisted of inflatable borehole packers, electromagnetic flowmeters, progressive cavity pumps, and paddle grout mixers.