Applications
Typical waterstop challenges addressed by our hands-on technicians include large-volume, high-pressure water inflows and construction in fractured, water-bearing ground conditions:
✔ Leaking rock conditions in hydro electrical infrastructure
✔ Leak sealing in sanitary sewer system
✔ Leak sealing through voids in caisson walls
✔ Stop flowing leaks in shored excavations
✔ Tunnel construction and maintenance
✔ Leaking concrete construction joints
Featured Projects
CN Tower
Hydrotite CJ-0725 was used as the waterstop where precast segments were joined to cast in place concrete.
Point Du Bois Generating Station
Hydrotite CJ-0725 and Leakmaster were used as a construction joint waterstop during the reconstruction and maintenance of the spillway reservoir at the Pointe Du Bois generating station.
Mildred Lake Settling Basin (MLSB)
Hydrotite CJ-3030 was installed in precast concrete panels in the construction of a headwall, as part of the overflow system at an oil sands facility. This application required the Hydrotite to be installed within tight tolerances to allow the precast panels to line-up correctly. Additionally, in order for the Hydrotite to be effective, it had to firmly adhere to the precast concrete surface.
Brilliant Dam
Hydrotite CJ-2020 with Leakmaster adhesive was used for construction joint waterproofing during the Brilliant Dam Expansion Project in Castlegar, BC. As part of this major hydroelectric project, the system was installed to provide a reliable seal between new and existing concrete structures, helping prevent water infiltration through construction joints and maintain the long-term watertight integrity of the expanded dam structure.
Smoky Falls Generating Station
CJ-0725 with Leakmaster adhesive was used as the primary hydrophilic waterstop for construction joints throughout the new construction project at the Smoky Falls Generating Station in Kapuskasing, ON. The system was installed in a variety of critical locations, including wall-to-footing joints, mechanical rooms, and pipe penetrations through floor slabs and cast-in-place concrete structures. Its use provided reliable sealing at construction joints and penetrations, helping protect the hydroelectric facility from water infiltration and maintain the watertight integrity of the new structures.